18519 Visakhapatnam - Mumbai Ltt Express timetable
Visakhapatnam - Mumbai Ltt Express (18519) runs from Visakhapatnam Junction (VSKP) to Lokmanya Tilak Terminus (LTT). The full journey covers 1,494 km and takes 29 h 10 min. The train runs daily.
Timetable checked on 17 October 2026.
Stops and timings
| Station | Arrival | Departure | Day | Stop time | Distance |
|---|---|---|---|---|---|
| Visakhapatnam Junction (VSKP) | Starts here | 23:20 | 1 | — | 0 km |
| Duvvada (DVD) | 23:50 | 23:52 | 1 | 2 min | 17 km |
| Pithapuram (PAP) | 01:24 | 01:25 | 2 | 1 min | 138 km |
| Samalkot Junction (SLO) | 01:38 | 01:40 | 2 | 2 min | 150 km |
| Rajahmundry (RJY) | 02:23 | 02:25 | 2 | 2 min | 201 km |
| Nidadavolu (NDD) | 02:54 | 02:55 | 2 | 1 min | 222 km |
| Tanuku (TNKU) | 03:23 | 03:25 | 2 | 2 min | 239 km |
| Bhimavaram town (BVRT) | 03:59 | 04:00 | 2 | 1 min | 270 km |
| Akividu (AKVD) | 04:19 | 04:20 | 2 | 1 min | 287 km |
| Kaikaluru (KKLR) | 04:39 | 04:40 | 2 | 1 min | 304 km |
| Gudivada Junction (GDV) | 05:13 | 05:15 | 2 | 2 min | 333 km |
| Vijayawada Junction (BZA) | 06:40 | 06:55 | 2 | 15 min | 377 km |
| Kazipet (KZJ) | 10:28 | 10:30 | 2 | 2 min | 594 km |
| Charlapalli (CHZ) | 12:18 | 12:20 | 2 | 2 min | 713 km |
| Secunderabad Junction (SC) | 12:40 | 12:50 | 2 | 10 min | 725 km |
| Lingampalli (LPI) | 13:29 | 13:30 | 2 | 1 min | 748 km |
| Vikarabad (VKB) | 14:24 | 14:25 | 2 | 1 min | 797 km |
| Tandur (TDU) | 14:59 | 15:00 | 2 | 1 min | 839 km |
| Wadi Junction (WADI) | 16:28 | 16:30 | 2 | 2 min | 909 km |
| Kalaburagi (KLBG) | 17:02 | 17:05 | 2 | 3 min | 946 km |
| Solapur (SUR) | 19:45 | 19:50 | 2 | 5 min | 1059 km |
| Pune Junction (PUNE) | 00:35 | 00:40 | 3 | 5 min | 1321 km |
| Lonavala (LNL) | 01:54 | 01:56 | 3 | 2 min | 1385 km |
| Kalyan (KYN) | 03:10 | 03:12 | 3 | 2 min | 1459 km |
| Lokmanya Tilak Terminus (LTT) | 04:30 | Ends here | 3 | — | 1494 km |
About Visakhapatnam - Mumbai Ltt Express
Visakhapatnam - Mumbai Ltt Express (18519) runs from Visakhapatnam Junction (VSKP) to Lokmanya Tilak Terminus (LTT). The full journey covers 1,494 km and takes 29 h 10 min. The train runs daily.
- Leaves from
- 23:20Visakhapatnam Junction · Day 1
- Reaches
- 04:30Lokmanya Tilak Terminus · Day 3
- Total travel time
- 29 h 10 min
- Total distance
- 1,494 km
- Runs on
- DailyFrom the first station
- Stops in between
- 2325 stations including the first and last
- Travel classes
- First AC (1A) · Second AC (2A) · Third AC (3A) · Sleeper (SL) · General (GN)
- On this train
- No pantry car · No catering service · LHB coaches
Some stops on this route
In travel order. Tap a station to see its live board.
Questions about train 18519
Where does train 18519 start and end?
Visakhapatnam - Mumbai Ltt Express (18519) starts from Visakhapatnam Junction (VSKP) and ends at Lokmanya Tilak Terminus (LTT). The timetable above lists the stations in travel order.
What are the departure and arrival times of train 18519?
It leaves Visakhapatnam Junction (VSKP) at 23:20 on Day 1. It reaches Lokmanya Tilak Terminus (LTT) at 04:30 on Day 3.
Which days does train 18519 run?
Visakhapatnam - Mumbai Ltt Express (18519) runs daily, from Monday to Sunday from Visakhapatnam Junction (VSKP). These are departure days from the first station. If you board later in the route, check the day shown at your station.
How long is the full journey on train 18519?
The scheduled travel time from Visakhapatnam Junction (VSKP) to Lokmanya Tilak Terminus (LTT) is 29 h 10 min. For a shorter journey, open Time between stations and select where you will board and get down.
How far does train 18519 travel?
Visakhapatnam - Mumbai Ltt Express (18519) covers 1,494 km from Visakhapatnam Junction (VSKP) to Lokmanya Tilak Terminus (LTT). The distance beside each station in the timetable is counted from the first station.
How many stops does train 18519 have?
Visakhapatnam - Mumbai Ltt Express (18519) has 23 stops between its first and last stations. The timetable has 25 stopping stations in total, including Visakhapatnam Junction (VSKP) and Lokmanya Tilak Terminus (LTT). Passing stations are not included in this count.
Which classes are available on train 18519?
The timetable lists First AC (1A), Second AC (2A), Third AC (3A), Sleeper (SL) and General (GN) for Visakhapatnam - Mumbai Ltt Express (18519). Use Check train fares below to check the fare for your stations and travel class.
Which platform is listed for train 18519?
The timetable lists platform 8 at Visakhapatnam Junction (VSKP) and platform 3 at Lokmanya Tilak Terminus (LTT). Check the station display or announcement for the platform on your travel day.
Is food service listed for train 18519?
The timetable lists Visakhapatnam - Mumbai Ltt Express (18519) without a pantry car. Catering service is not listed for this train.
What type of coaches does train 18519 use?
The timetable lists LHB coaches for Visakhapatnam - Mumbai Ltt Express (18519).
What do Day 1, Day 2 and Day 3 mean?
Day 1 is the day the train leaves its first station. Day 2 is the next day, and Day 3 is the day after that. Check both the time and the day at your boarding station, especially for departures after midnight.
How do I save or share the timetable for train 18519?
Tap Save image above to download the full timetable as one image. It includes all train stops, even when you search for a station or filter by day. Tap Share to send the timetable image with its RailCore link where your browser supports image sharing.
All times are in Indian Standard Time (IST).